Putting Into Service 3 Concrete Bridges in Bao Lam District, Cao Bang, Built by the Humanitarian Fund
Table of contents
- The Ban Bung bridge measures 20 meters in length and 3.5 meters in width, with a span of 12 meters;
- The Na Mat bridge measures 9 meters in length and 3.5 meters in width, and was started on December 10, 2022;
- The Pac Rang bridge measures 28 meters in length, 3.5 meters in width, with a span of 16 meters; construction began on December 11, 2022.


The 3 bridges are important transit points. Indeed, numerous waterfalls, steep slopes or sudden local flooding, especially during the rainy season, make the movement of people very difficult.
We are honored to have contributed in small part to the construction of these 3 bridges. They were completed to meet the mobility needs of 443 families that group together over 2,300 residents. This makes it possible for residents of nearby communes to connect and exchange goods, thus contributing to local socio-economic development.
At HORIZON VIETNAM TRAVEL, a large part of the agency’s profits is dedicated to humanitarian activities. The Horizon Vietnam team wishes to express its deep gratitude to you, dear travelers, for choosing us and for helping us carry out our humanitarian activities.
Français
Español
Português
Deutsch






